FY 2018 Supervision and Inspection Plan for the Quality Assurance of Projects Relevant to Soil and Groundwater Pollution Investigation

Absrtact
The 2018 “Supervision and Inspection for the Quality Assurance of Projects Plan Relevant to Soil and Groundwater Pollution Investigation (SISG/QAPP)”is a two years project which targeted on supervising and inspecting the soil and groundwater protection/remediation projects conducted by the City or County Environmental Protection Agency of the Republic of China. The SISG/QAPP executes 1. Launch a consensus assessors workshop for harmonizing assessor standard. 2. Review of the original project Quality Assurance Plan per the Quality Assurance Project Plan (QAPP) framework. 3. Audit the on-site sampling and laboratory activities. 4. Proficiency Test using CRM. 5. Annual Assessors Workshops. 6. Annual Environmental Testing Laboratories QAPP Workshop. 7. Trial run for the new drafted QAPP framework. All SISG/QAPP project objectives have been achieved, included: 1. Annual assessors consensus workshop. 2. Review and approve QAPP 49 cases in 2018 (per 73reviews) and 39 cases in 2019 (per 52 reviews). 3. 23 on-site impromptus samplings inspections, 26 impromptus laboratories inspection were conducted in 2018. 21 on-site impromptus samplings inspections, 19 impromptus laboratories inspection were conducted in 2019. 4. The PT tests for 14 laboratories on soils, groundwater and sledges with total 143 test items in 2018 were conducted with 100% passed. The PT tests for 16 laboratories on soils, groundwater and sledges with total 173 test items in 2019 were conducted with 97.7% passed. Five laboratories were selected and audited followed by the delivery of the PT samples annually. With zero non conformity found, the environmental testing laboratories have demonstrated their proficiency in executing their QAPP project. 5. Annual assessors review workshop. 6. Annual Environmental Testing Laboratories QAPP Workshop. 7. Three testing laboratories trial run for the new drafted QAPP framework annually. All laboratories and county city EPA were informed by the non-compliance findings officially with the corresponding correction activities to improve the laboratories testing skill and data quality. The future project will be aiming at the same direction to fortify the core objectives of this SISG/QAPP.
Keyword
Soil, groundwater, Quality Assurance Project Plans(QAPP)
Open
top